How we research

C. V. Wooster writes Lead Pipe by ZIP at Taciturn Studios. A page is a set of sentences we can point at a utility, a state agency, a statute, or EPA. This note is the method, and it is also the list of what we refused to publish.

File verified . Each location page carries its own date.

What gets a number

A figure, date, or cost is published only when a water utility, a state drinking-water agency, a statute, or EPA states it. The page links that source. News is used only to point at a lawsuit docket, and it is labeled. The tools and the location pages read one file, the same file the tools use. If Denver Water's map page says 60,000 to 64,000 homes and its semi-annual report says 18,345 lines remaining, both sentences stay, with the date and the document, because they are not the same count. We do not average them.

Galvanized-requiring-replacement and unknown lines are printed only when the utility or the state inventory uses those categories. A page that says "roughly 65,000 residential lead service lines," as Milwaukee's does, does not get an invented unknown column beside it.

What the location pages are built around

Each published state page is one water system, chosen because its inventory, its customer cost, or its state rule is different from the next system's. Chicago's leak replacement is not Columbus's lien, and Columbus's lien is not Seattle's finding that it has no known lead service lines. Headings follow that difference. A shared outline of "key facts / what to do next" is how a site ends up saying the same thing thirteen times.

The federal deadlines are EPA's October 2024 fact sheets: inventory on October 16, 2024, Lead and Copper Rule Improvements compliance on November 1, 2027, full replacement of lead and galvanized-requiring-replacement lines under the system's control within 10 years, with the rate first checked on December 31, 2030. A deferral is available, on EPA's FAQ, only past 39 replacements per 1,000 service connections a year, and the state still has to call that rate the fastest feasible. We do not announce that any city has been granted one.

The American Water Works Association case, D.C. Circuit No. 24-1376, was argued on September 30, 2026. NRDC, an intervenor, says EPA defended the rule and that a decision is likely months afterward. The dates on the site are the dates EPA published. They are not a prediction about the case.

The identification steps

The checklist uses EPA's Protect Your Tap guide, which says a penny or a key and a magnet are the kit, and EPA's Science Matters note that lead is dull, soft, and non-magnetic and turns shiny silver when scratched. We do not add a home-age cutoff as if a year of construction proved the pipe. The utility map is the first step because the scratch only sees the piece in the basement.

Places we did not publish

Those URLs still resolve, with noindex, so an old bookmark is not a 404 and a thin page is not offered to search. Systems inside a published state that we did not re-read, including Philadelphia and the Chicago suburbs, are named as out of scope on the page rather than summarized from memory.

Utilities in the file

Corrections

If a program page moved or a dollar figure changed, send the official link. We open it, change the file, and put the date on the updates log. Payment does not buy a sentence. Advertising and the Amazon links elsewhere on the site are labeled and do not pick which utility we write up.