Columbus Water and Power

Columbus: sign the work agreement, or the lien is called LEAP

Columbus will replace a lead or galvanized line at no cost when your street's turn comes, if you have signed the work agreement. Going sooner means a 0 percent lien of up to $10,000, due when you sell or refinance.

By C. V. Wooster, Taciturn Studios · Updated November 21, 2026 · How we research

Last verified 2026-11-21 against the utility, state, or EPA pages linked at the bottom. Figures move. The official page wins if this one is behind.

50,000 to 60,000 homes, lead and galvanized together

Columbus tells you to enter the address on its project map. Zoom in and the dot shows the estimated material and whether the block is in an active or upcoming area. The city says that view covers whether your home may be one of 50,000 to 60,000 homes with a possible lead or galvanized service line. It does not split those two materials into separate totals, and it does not publish an unknown count. If the dot says unknown, the material survey takes a few minutes and is what gets the record updated.

The inventory map itself, on the city's ArcGIS hub, shows the public side and the private side. The utility owns from the main to the curb stop. You own from the curb stop to the meter.

What was countedFigureAs of
Homes with a possible lead or galvanized service line, as stated next to the map50,000 to 60,000See the source page

Columbus states this as a range of homes with a possible lead or galvanized line. It does not split lead from galvanized, and it does not publish an unknown count. We did not split it.

The free replacement is permission, not a place in line you can buy

The scheduled program is a 12-year project that began in 2025. When construction reaches your street, the city replaces a lead or galvanized line at no direct cost, if the work agreement is signed. Only the owner on the Franklin County Auditor's site can sign it. Signing does not pick your year. It lets the crew work when the year arrives. Without that signature, the city says the owner has to replace the line, and that the cost can be $6,000 to $10,000.

Leaks on the private line before construction starts are still yours. The city also says that even a copper listing is worth a signature, because older repairs may have left galvanized or lead-contaminated pieces, and because the crew may need to move the meter. Licensed schools and daycares are among the first sites. If the city does emergency work on the public side, it comes back for a private lead or galvanized side. Call 614-645-6725 or write leadsafelines@columbus.gov.

Columbus service line materials map

Enter the address and click the dot. The pop-up shows the public side and the private side. The city says the map also shows whether the home may be one of 50,000 to 60,000 homes with a possible lead or galvanized line, and whether the block is in an active or upcoming project. Unknown results can be corrected with the material survey.

LEAP is a lien with no monthly bill and a $10,000 cap

If the line is leaking, or you want it replaced before the street project, Columbus offers the Lead Elimination Assistance Program. There is no money due up front. The cost becomes a lien. The city describes it as a zero-interest loan stuck to the property, with no monthly payments and no hard deadline short of 99 years. You pay it in one lump sum when the house is sold or when a refinance takes money out. It has to be paid before you take a second mortgage. It is not added to the water bill. An inheritance that does not pay anyone out does not trigger it.

The lien covers up to $10,000, including restoration if the restoration is in the same quote. You choose the contractor. The contractor has to be certified for water service lines and registered with the city's vendor services. You gather three quotes and email them to LEAP@columbus.gov. Work starts only after the city, you, and the contractor sign a three-party agreement and you get a notice to proceed. The city's goal for that paperwork is two to three weeks. If the house has no water, it stays without water until the line is in. Work done before the notice is not reimbursed, and a replacement you already finished is not reimbursed either.

Program
Scheduled city replacement, or the LEAP lien if you go sooner
Who pays
The city, when scheduled construction reaches the street and the owner has signed a work agreement. LEAP if the owner goes early or has a leak.
What the customer pays
$0 on the city schedule if the work agreement is signed. If it is not signed, the city says the owner pays, and that the bill can be $6,000 to $10,000. LEAP is a 0 percent lien up to $10,000, due when the home is sold or refinanced.
Timing
A 12-year project that began in 2025. Signing the work agreement gives permission. It does not set a date. LEAP's own paperwork goal is 2 to 3 weeks, and a house with no water stays without water until the replacement is done.

Columbus lead service line program, work agreement, and LEAP

Phone on the utility page: 614-645-6725.

A 12-year local schedule next to a 10-year federal one

The city program started in 2025 and is described as 12 years, so the last streets are years away from the first ones. EPA's mandatory programs start no later than November 1, 2027 and then have 10 years, unless a deferral is approved. Columbus does not, on the page we used, say it has asked for a deferral or name the year the last street is scheduled. The decision in front of an owner this month is narrower: sign the work agreement for the free slot, or open LEAP and accept a lien of up to $10,000.

We verified Columbus. Lima, Springfield, Toledo, and other Ohio systems publish their own terms. They are not summarized here.

Dates in this section follow EPA's October 2024 fact sheets, which are listed on the method page: an initial inventory on October 16, 2024, Lead and Copper Rule Improvements compliance on November 1, 2027, and full replacement within 10 years with the first rate check on December 31, 2030. A longer schedule is available only if a 10-year pace would mean more than 39 replacements per 1,000 service connections a year, and the state still has to call that pace the fastest feasible. The American Water Works Association sued over the rule (D.C. Circuit No. 24-1376). NRDC, which is in the case, says argument was held on September 30, 2026, EPA defended the rule, and a decision is likely months after argument. The dates on this page are the ones EPA published in October 2024.

If your water bill is from Columbus Water and Power

  1. Search the service line map and see if the block is in a project area.
  2. If the line is lead or galvanized, sign the work agreement. Columbus says that signature is what makes the scheduled replacement free.
  3. If the line is leaking now, or you do not want to wait for the 12-year list, read LEAP before you hire anyone. Work done before the notice to proceed is not covered, and the cap is $10,000.
  4. Send three quotes to LEAP@columbus.gov. The contractor has to be certified for water service lines and registered as a city vendor.

Open the lookup tool Compare what customers pay Print the next steps

Guides to read with the Columbus record

Other utilities checked on 2026-11-21: Colorado, Illinois, Wisconsin, New York, Pennsylvania, Michigan, Rhode Island, Minnesota, Louisiana, Florida, Maryland, Washington.

Sources

  1. Columbus Water and Power, Lead Service Line Replacement Program, work agreement, and LEAP
  2. Columbus service line material inventory map
  3. EPA fact sheet: 2021 LCRR requirements retained, and LCRI compliance dates (October 2024)
  4. EPA fact sheet: calculating service line replacements (October 2024)
  5. EPA fact sheet: service-line inventory and replacement (October 2024)
  6. EPA FAQ for states and public water systems on the final LCRI (October 2024)
  7. NRDC case page: American Water Works Association v. EPA, updated September 30, 2026